A&A Prime Solutions

What we do

Two infrastructure processes. Run end to end.

Data centres and subsea cable are sold as advisory engagements everywhere. What clients actually need is someone who stays through the joint venture, the licence, the contract and the commissioning — not just the recommendation. Below is the process, in the order we actually run it, and the traffic exchange and settlement platform we are building with dFlo.ai on top of that work.

Data Centre Advisory & Delivery

Site to switch-on.

Southeast Asia's AI build-out is a land, power and licensing race before it is a compute race. Singapore's grid is full and its land is scarce; Indonesia has both, and a fast-growing appetite for sovereign AI infrastructure, but little of the playbook that turns a plot of land into a bankable, operator-ready facility.

We run that playbook end to end, and stay in it: from the first site screen to the day a GPU cluster goes live, through every joint venture, financing and licensing conversation in between.

  1. 01

    Site identification

    We screen land against power availability, fibre and subsea proximity, water access and grid stability across Singapore and Indonesia, and shortlist sites that can actually be built and licensed — not just ones that look good on a map.

  2. 02

    Field study & due diligence

    Boots on the ground before capital moves: power capacity studies, geotechnical and environmental survey, connectivity mapping and risk assessment on every shortlisted site.

  3. 03

    Local partner & JV formation

    We identify and vet local landowners, utilities and operators, and structure the joint venture that satisfies Indonesian ownership rules and gives every party a stake worth protecting.

  4. 04

    Financial structuring

    Capital stack design, debt and equity mix, and introductions to the investors and lenders who fund data centre builds in the region.

  5. 05

    Legal & regulatory advisory

    JV agreements, land rights and permits, power purchase agreements, and the KOMINFO, BKPM and IMDA filings that keep a project bankable.

  6. 06

    Chip & compute sourcing

    Identifying and coordinating distribution channels for the GPU platforms a facility is built around, including NVIDIA H200, B300 and GB300, so the racks are spoken for before the concrete is poured.

  7. 07

    Contract fulfilment & execution

    Negotiating and fulfilling the construction, colocation and supply contracts that turn a plan into a build, with our partner network executing on the ground.

  8. 08

    Delivery & installation

    Fit-out delivery against the spec set at the field study stage, then rack, cooling, power and GPU cluster installation and commissioning.

  9. 09

    Handover to operator

    Handover to a data centre operator, directly or through our partner network, with the run-books and SLAs that keep a facility live for its design life.

Subsea Cable Development

Consortium to leased capacity.

A subsea cable is a decades-long infrastructure asset, built by parties who often meet for the first time at the MOU signing. Getting from that first conversation to a system carrying paid traffic means holding a consortium, a licensing timeline and a construction schedule together across multiple jurisdictions at once.

We sit in the middle of that process for international and domestic routes alike — assembling the consortium, securing the landing rights, and staying on until the capacity is sold.

  1. 01

    Gathering the consortium

    Assembling the international and domestic carriers, investors and hyperscalers who will co-develop and co-own the system — the hardest and most important step, done first.

  2. 02

    Cable landing station

    Identifying and securing landing station sites at each end of the route, and the beach manhole and backhaul path that connects them inland.

  3. 03

    Licensing

    Marine survey permits, cable landing licences, and the telecom and maritime approvals a system needs cleared before a single kilometre is laid.

  4. 04

    Consortium MOU & agreements

    Negotiating the MOU and the construction and maintenance agreements between developer parties that make a consortium a legal entity, not just an intention.

  5. 05

    Execution & delivery

    Managing marine survey, manufacture and cable-lay through to ready-for-service, coordinated across every consortium party and jurisdiction on the route.

  6. 06

    Operating the system

    Bringing the system into live operation: NOC handover, maintenance agreements and the O&M model that keeps it running for its design life.

  7. 07

    Offtake & capacity leasing

    Finding the offtakers and structuring the IRUs and leases that turn laid fibre into a revenue-generating asset.

Software · Built with dFlo.ai

See the traffic. Settle the revenue.

Telecom operators exchange enormous volumes of traffic, but rarely know, flow by flow, who it belongs to or what it's worth. We are building the platform that answers that, in partnership with dFlo.ai, our AI and software engineering partner.

At the centre is a traffic engine: it identifies where a packet is going and what content or service it is serving, and turns that into the inputs a commercial team needs directly — policy, billing, ratings and SLAs — with a settlement API that turns the numbers into money actually moving between operators.

In development with dFlo.ai
  1. 01

    Provider attribution

    Every flow traced back to the upstream or downstream provider it belongs to, automatically, at the traffic-engine level.

  2. 02

    Metering

    Usage measured as traffic actually moves, not estimated or sampled after the fact.

  3. 03

    Rate plans

    Policy-driven pricing applied per provider, content type or service class.

  4. 04

    Settlement rules

    Interconnect and revenue-sharing logic encoded once and applied consistently across every counterparty.

  5. 05

    Reporting

    Operational and commercial reporting drawn from the same live traffic data, not a separate export.

  6. 06

    APIs

    Programmatic access to metering, rating and settlement data for billing and OSS/BSS systems downstream.

  7. 07

    Billing

    Usage and policy outputs feed straight into billing, without manual reconciliation.

  8. 08

    Revenue sharing

    Multi-party splits calculated and auditable at the level of individual traffic flows.

  9. 09

    Regulatory reporting

    The same underlying data, structured for the submissions regulators actually ask for.

Start the process

Which step are you at?

Tell us where you are in any of these. We can join at site selection, at the MOU table, or on a briefing call about the platform.

hello@aaprime.co